Project image
Rapid-Hardening Cement Ideal for Cold-Weather Concreting

Work was performed in temperatures from 18° to 49° degrees Fahrenheit. Rapid Set® DOT Cement’s high early strengths allowed the concrete to be exposed to freezing temperatures that portland cement concrete typically can’t handle.

READ MORE


Project image
Partial-Depth Bridge Deck Repairs

The fast-setting cement is on SCDOT’s list of qualified products because it meets all specifications. It includes air-entrainment where freeze-thaw cycles are prominent and a superplasticizer for better workability.

READ MORE


Project image
Lincoln Tunnel Helix Gets Makeover with Minimal Traffic Disruption

Time is of the essence when you’re rehabilitating infrastructure used by 40 million vehicles a year. The Port Authority of New York & New Jersey chose two Rapid Set® products because they eliminated the need for admixtures as well as met a tight opening strength requirement.

READ MORE


Project image
Alert Travelers and Quick Repair Keep MoDOT Hwy 22 Safe

MoDOT's Northeast District bridge crews immediately closed the westbound lane of the 67-year-old bridge to repair a large hole. By using DOT Cement for this emergency repair, traffic was reopened to travelers the same day.

READ MORE


Project image
Keeping High-Traffic Infrastructure Smooth and Crack-Free

The George Washington Bridge carries more than 106 million vehicles a year, making it the world’s busiest motor-vehicle bridge. The pothole-riddled north- and south-bound access ramps that connect the bridge to New York State Route 9A needed to be repaired. The Port Authority needed to reopen the busy ramps in a timely manner to not disrupt traffic patterns. Products used include Concrete Mix and DOT Cement.

READ MORE